🌡️ The ROI of Waste Heat Recovery: Calculating Payback for VAM Chillers in India
Quick Links: Understanding Waste Heat Recovery | Capital Investment | Annual Savings | Real ROI Scenarios | Lifecycle ROI | Decision Framework
Understanding Waste Heat Recovery Economics 🔥
Every industrial facility generates waste heat from boilers, furnaces, diesel generators, or process equipment. VAM (Vapor Absorption Machine) chillers convert this lost energy into productive cooling. The ROI equation:
ROI = (Annual Savings + Hidden Benefits) ÷ Incremental Capital Investment
Capital Investment: What You'll Actually Spend 💰
Complete System Costs (500 TR Example)
- BROAD Exhaust-Fired VAM Chiller: Equipment ₹5.5-6.5 crores
- Heat recovery integration: ₹60-80 lakhs
- Auxiliary equipment: ₹1.2-1.5 crores
- Installation & commissioning: ₹40-60 lakhs
- Total CAPEX: ₹7.7-9.4 crores
Incremental investment vs. standard 500 TR electric chiller: ₹3-3.9 crores – this is what your savings must justify for positive ROI.
Annual Savings: The Revenue Side ⚡
- 💡 Displaced Electricity Costs: 500 TR electric chiller consumes ~1.26 million kWh/year. Savings ₹88 lakhs–1.51 crores depending on kWh rate.
- 📉 Demand Charge Reduction: Peak demand eliminated 900 kVA; annual savings ₹32-54 lakhs.
- 🔥 Generator Efficiency Improvement: Waste heat recovery reduces backpressure, saving ₹4.2 lakhs fuel/year.
- 🔧 Avoided Future Chiller Replacement: Reduces incremental investment, accelerating payback.
Real ROI Calculations: Three Indian Scenarios 🇮🇳
| Industry |
System |
Annual Savings |
Payback |
| Pharmaceutical, Gujarat |
600 TR exhaust-fired VAM |
₹2.36 crores |
1.53 yrs (18 months) |
| Textile Mill, Tamil Nadu |
400 TR steam VAM |
₹1.52 crores |
1.84 yrs (22 months) |
| Food Processing, Maharashtra |
500 TR hot water VAM |
₹2.04 crores |
1.42 yrs (17 months) |
Lifecycle ROI: The 20-Year Perspective 🌱
- Energy cost avoidance: ₹18.5 crores
- Demand charge savings: ₹5.2 crores
- Carbon credits: ₹2.8 crores
- Avoided replacement costs: ₹2.5 crores
- Total Value: ₹29 crores → NPV ₹20 crores, IRR 35-45%
Decision Framework: When ROI Justifies Investment ✅
- Proceed Confidently: Payback < 3 yrs, Operating hours > 4,000/year, Electricity rates > ₹8/kWh
- Proceed Cautiously: Payback > 5 yrs, Seasonal operation, Small capacity <100 TR
- Reconsider: Payback > 7 yrs, Unreliable heat source, Very low electricity rates
💡 Ready to Calculate Your Facility’s VAM ROI?
Turn wasted thermal energy into productive cooling, reduce electricity costs, and maximize lifecycle value with BROAD Steam VAM chillers.